1 2 3 Previous Next 31 Replies Latest reply: Aug 21, 2012 11:30 AM by Avneesh Sisodia RSS

Deployment of "war" was rolled back with failure message Operation cancel led

Avneesh Sisodia Newbie

Hello all,

I am trying to deploy a war on JBoss AS 7.0.

I am facing some issue that I don't know exactly.

Staktrace on console is::::::::::

 

 

12:18:36,591 INFO  [org.apache.catalina.core.ContainerBase.[jboss.web].[default-host].[/RI]] (MSC service thread 1-2)
 Initializing Spring root WebApplicationContext
12:20:08,482 ERROR [org.jboss.as.deployment] (DeploymentScanner-threads - 1) 
Did not receive a response to the deployment operation within the allowed timeout period [120 seconds]. 
Check the server configurationfile and the server logs to find more about the status of the deployment.
12:20:08,482 INFO  [org.jboss.as.server.controller] (DeploymentScanner-threads - 2) 
Deployment of "RI.war" was rolled back with failure message Operation cancelled

 

I am attaching sever log and boot log with post.

Please help me..:)

1 2 3 Previous Next