5 Replies Latest reply: Feb 6, 2009 12:45 PM by Ronald van Kuijk RSS

Problem with task form generation with defined variables

Marcin Zajaczkowski Newbie

Hi,

In a process definition I have:

<task-node name="Set Project Name">
 <task name="Set Project Name" swimlane="ProjectDirector">
 <controller>
 <variable access="read,write,required" name="projectName" mapped-name="Project Name"></variable>
 </controller>
 </task>
 <transition to="Set something else"></transition>
</task-node>


but when I try to generate a form for that task (Details->Generate Form) I see no fields in a "Define the form fields". I wonder if they shouldn't be copied from the variables defined in that task?

I have to set it manually in the "Generate Task Form" diagram. But even then after another call of "Generate Form" form fields list in empty again.

I saw a bug:
http://jira.jboss.org/jira/browse/GPD-194
but I can generate a form when I add (every time) form fields manually.

Could you tell me what I do wrong?

I'm using JBoss jBPM JPDL Designer Plugin 3.1.2.GA in Eclipse 3.3.1.1.

Regards
Marcin